发明名称 CONSTRUCTION METHOD FOR UNDERGROUND REMAINS-LAYING ROOM OF CHARNEL HOUSE
摘要 PURPOSE: A construction method for underground remains-laying room of a charnel house is provided to prevent dew condensation by constructing a charnel house underground and exposing only a roof. CONSTITUTION: A construction method for underground remains-laying room of a charnel house comprises the steps of; excavating, and paving gravels on the floor of remains-laying room, and installing drain pipes that have inundation holes(31); installing bars on the gravel layer and concreting; installing molding forms on the edge, and installing bars on the inside of mold forms; exposing the drain pipe of floor and installing air vent pipes(19) to be exposed to the inside of retaining wall; installing bolts(27) to be exposed to the outside of mold forms, and binding one end of covering wire with bars and exposing the other end to the outside of mold form; concreting; fixing a guide(22) of elevator(21) and fixing a rubber gasket(24) on the upper part of retaining wall.
申请公布号 KR20000063491(A) 申请公布日期 2000.11.06
申请号 KR20000040999 申请日期 2000.07.18
申请人 YUN, JAE KWAN 发明人 YUN, JAE KWAN
分类号 E04H13/00;(IPC1-7):E04H13/00 主分类号 E04H13/00
代理机构 代理人
主权项
地址
您可能感兴趣的专利