发明名称 |
A LOADING ARRANGEMENT FOR SHUTTLE TANKERS |
摘要 |
A bow loading arrangement for shuttle tanker where the mooring winch drum (13) and hose handling winch drum (9) are operated both together and independently of each other by the same drive unit (14). The winch may be placed on the main deck, and by using guide pulleys (10, 11) both the hose handling rope (15) and the mooring hawser (1) can be guided to the respective drums.
|
申请公布号 |
WO0002773(A1) |
申请公布日期 |
2000.01.20 |
申请号 |
WO1999NO00221 |
申请日期 |
1999.06.30 |
申请人 |
MARITIME PUSNES AS;AANESS, LARS |
发明人 |
AANESS, LARS |
分类号 |
B63B27/30;B63B21/16;B63B27/24;B63B27/34;(IPC1-7):B63B27/30 |
主分类号 |
B63B27/30 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|