发明名称 |
METHOD OF ISOLATING LOST CIRCULATION ZONES IN DRILLED WELL |
摘要 |
FIELD: drilling of oil and gas wells, in particular, isolation of lost circulation zones in drilled wells. SUBSTANCE: method includes successive supply to circulating drilling mud of fringes of carbonate dust and acid solution. Prior to supply of acid solution fringe supplied to drilling mud is fringe of foam-generating surfactant. In this case, fringes are supplied in the same volumes. EFFECT: higher efficiency due to increased stability of isolating gas-liquid barrier. 2 cl, 1 tblv
|
申请公布号 |
RU2123107(C1) |
申请公布日期 |
1998.12.10 |
申请号 |
RU19970110962 |
申请日期 |
1997.07.08 |
申请人 |
ZAKRYTOE AKTSIONERNOE OBSHCHESTVO "INTOJL" |
发明人 |
SHAKHVERDIEV AZIZAGA KHANBABA OGLY;PANAKHOV GEJLANI MINKHADZH OGLY;SULEJMANOV BAGIR ALEKPER OGLY;ABBASOV EHL'DAR MEKHTI OGLY;GAJNANSHIN SH.I. |
分类号 |
E21B43/32;E21B21/14;(IPC1-7):E21B43/32 |
主分类号 |
E21B43/32 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|