摘要 |
PURPOSE:To provide a scheduling processor capable of adjusting loads while adhering to a due date. CONSTITUTION:The loads of respective processes are calculated in a load stack part 5 and the Gantt chart is displayed in a Gantt chart display part 7. A scheduling operator adjusts the loads while confirming the presence of an order to be behind the due date and influence on the other processes while moving the preparation schedules of the respective orders to the time before and after through a load leveling part 9. In the case of being behind the due date, L/T (lead time) is changed through an L/T (lead time) change part 8. |