发明名称 LINING SHIELD METHOD
摘要 PURPOSE:To reduce the construction cost of a tunnel by setting the outside diameter of the cutter of a shield greater than that of a skin plate, and packing excavated earth and sand with a solidifier on the outside of the skin plate, thereby forming primary lining. CONSTITUTION:A primary lining layer A is formed on the outside of the cylindrical skin plate 10 of a shield by mixing earth and sand excavated by the projecting portion 16 of a cutter 11 with a solidifier and packing the mixture. While a tunnel is excavated, the primary lining layer A is formed progressively by use of the surplus soil of excavation and a secondary lining layer B is formed inside. The construction cost of the tunnel can thus be reduced by disposal of the surplus soil and reduction in lining.
申请公布号 JPH06123196(A) 申请公布日期 1994.05.06
申请号 JP19910203036 申请日期 1991.08.13
申请人 SHIMIZU CORP 发明人 MIYAZAWA KAZUO
分类号 E02D3/12;E21D9/04;E21D9/06;E21D9/08;E21D9/087;(IPC1-7):E21D9/06 主分类号 E02D3/12
代理机构 代理人
主权项
地址