摘要 |
<p>In a model-based dynamically configured system (15, 25), various processing components (65, 75, 87) are created dynamically, interfaced to each other, and scheduled upon demand. A combination of data driven and demand-driven scheduling techniques (Fig. 5, 6) are used to enhance the effectiveness of the dynamically configured system.</p> |