发明名称 METHOD FOR CONSTRUCTING MULTIGIRDER CONCRETE BRIDGE
摘要 PURPOSE:To achieve simplification by providing movable supporting girders on both sides of each main girder, putting a partial form on each supporting girder, moving the supporting girders and suspending a bottom frame of each main girder between a pier and an intermediate column by hand and crane. CONSTITUTION:Supporting girders 3 provided on both sides of each main girder, each of which carries a partial form 6 thereon, advance. A bottom frame 4 of the main girder is lifted from the ground and suspended between a pier 1 and an intermediate column 2, so that reinforcing bars for the main girder and PC steel are assembled in advance on the frame 4 before the partial form 6 is brought thereto. At this time, each of the supporting girder 3 is brought to an assembling position in the interval in the rear, where partial forms 6 and bottom frames 4 are assembled and reinforcing bar arrangement of an upper floor, concrete placement and curing are performed. And when the form 6 is placed on the frame 4 having been assembled, the frame 4 is lifted by means of the girders 3 on both sides to place it at an assembling position so that the frame 4 and the form 6 are assembled to form the whole form.
申请公布号 JPH0485405(A) 申请公布日期 1992.03.18
申请号 JP19900197632 申请日期 1990.07.27
申请人 FUJI PII ESU:KK 发明人 OKUBO CHIKASHI
分类号 E01D1/00;E01D21/00;E01D101/24;E01D101/26;E01D101/28 主分类号 E01D1/00
代理机构 代理人
主权项
地址