摘要 |
PROBLEM TO BE SOLVED: To enable developing efficiently a new simulator by only incorporating object plant behavior model for a plant model when simulators for performing operation training of various plants capable of modeling an incineration plant, an electric power plant, and the like are developed. SOLUTION: When the change of speed of a training function of a simulator is performed, a controller section 16 can corresponds keeping an operation period fixed by changing a control parameter adjusting to the switching of an operation period of a plant model section 18, and a controller of an actual machine plant can be utilized. Also, a training control function is used widely by making a training control function required for training by a simulator a module by a general-purpose computer of the plant model section 18, development of a simulator can be performed by only replacing of the plant model section 18. |