发明名称 Method for constructing an earth embankment involves introduction of at least a few layers of load distributing elements during or after construction of a consolidated central region
摘要 <p>The method for constructing an earth embankment involves introduction of at least a few layers of bar-shaped load distributing elements during or after construction of a consolidated central region. Hooks are used to join the load distributing elements to the distance maintenance members. An independent claim is also included for a resultant earth embankment.</p>
申请公布号 DE10311597(A1) 申请公布日期 2004.09.23
申请号 DE2003111597 申请日期 2003.03.14
申请人 HUESKER SYNTHETIC GMBH 发明人 ALEXIEW, DIMITER
分类号 E02D29/02;(IPC1-7):E02D29/02 主分类号 E02D29/02
代理机构 代理人
主权项
地址