发明名称 |
Method for coordinating operation of an off-grid, hybrid power system and an information technology system |
摘要 |
A method for coordinating operation of an off-grid, hybrid power system and an information technology (IT) system comprising the following steps: powering the IT system with the off-grid, hybrid power system according to a power generation management scheme designed to maximize fuel savings, wherein the hybrid power system comprises a generator and an electrical energy storage source; monitoring tasks performed by the IT system with a processor; determining which component of the hybrid power system is currently powering the IT system; and dynamically changing the tasks performed by the IT system depending on which component of the hybrid power system is currently powering the IT system such that the IT system only performs high priority tasks when the energy storage source is powering the IT system and such that a queue of low priority tasks are held in abeyance until the generator is powering the IT system. |
申请公布号 |
US9575550(B1) |
申请公布日期 |
2017.02.21 |
申请号 |
US201514857356 |
申请日期 |
2015.09.17 |
申请人 |
The United States of America as represented by Secretary of the Navy |
发明人 |
Oiler Jonathon Keith;Higier Andrew Michael;Grady Daniel Carl |
分类号 |
G06F1/00;G06F1/32;H02J7/00 |
主分类号 |
G06F1/00 |
代理机构 |
SPAWAR Systems Center Pacific |
代理人 |
SPAWAR Systems Center Pacific ;Eppele Kyle;Anderson J. Eric |
主权项 |
1. A method for coordinating operation of an off-grid, hybrid power system and an information technology (IT) system comprising the following steps:
powering the IT system with the off-grid, hybrid power system according to a power generation management scheme designed to maximize fuel savings, wherein the hybrid power system comprises a generator and an electrical energy storage source; monitoring tasks performed by the IT system with a processor; determining which component of the hybrid power system is currently powering the IT system; and dynamically changing the tasks performed by the IT system depending on which component of the hybrid power system is currently powering the IT system such that the IT system only performs high priority tasks when the energy storage source is powering the IT system and such that a queue of low priority tasks are held in abeyance until the generator is powering the IT system. |