WATER PROOFING AND TILE CONSTRUCTION METHOD FOR CONCRETE FACILITY FINISHED TILE
摘要
A method of waterproofing and constructing tiles for a concrete desalination plant with finished tiles of the present invention is configured to comprise a first step of processing a surface; a second step of applying a primer; a third step of compressing a corner and an edge; a fourth step of applying an urethane primer on a wall body surface; a fifth step of applying the urethane primer on a floor surface; a sixth step of forming a second waterproofing layer; a seventh step of an urethane ganister sand on the wall body surface; an eighth step of creating a floor mortar; a ninth of constructing tiles; a tenth step of constructing tile joints; and an eleventh step of finishing the construction. [Reference numerals] (AA) Construction method flowchart; (BB) First step : processing a surface; (CC) Second step : applying a primer; (DD) Third step : compressing a corner and an edge; (EE) Fourth step : adjusting the surface of a wall body surface and forming a first waterproofing layer; (FF) Fifth step : adjusting the surface of a floor surface and forming the first waterproofing layer; (GG) Sixth step : forming a second waterproofing layer; (HH) Waterproofing construction step; (II) Seventh step : applying an urethane ganister sand on the wall body surface; (JJ) Eighth step : creating a floor mortar; (KK) Ninth step : constructing tiles; (LL) Tenth step : constructing tile joints; (MM) Eleventh step : finishing the construction; (NN) Tile constructing step
申请公布号
KR101379486(B1)
申请公布日期
2014.04.14
申请号
KR20130125596
申请日期
2013.10.21
申请人
INTECK INDUSTRY CO., LTD.;BK INSTITUTE OF WATERPROOFING & ANTICORROSION TECH CORP.;TEKNIX D&C CO., LTD.
发明人
KIM, YOUNG SUK;JUNG, KANG GIN;SONG, JE YOUNG;CHOI, EUN KYU;LEE, JUNG HUN;LEE, SUN GYU