发明名称 CONSTRUCTION METHOD OF CELLAR FOR BUILDING COMPLETED
摘要 <P>PROBLEM TO BE SOLVED: To provide a construction method of a cellar for a building completed. <P>SOLUTION: The construction method includes: a step of making a plurality of holes and a slot pass through bottom concrete at the bottom part of the building completed so as to be communicated with the holes, inserting a support to the inside of the slot and making a stopper projected at the lower part of the support be engaged with the lower part of the slot to fix it; a step of providing a press-in machine on the upper part of the support; a step of inserting hollow piles to the respective holes, then pushing the piles into the underground using the press-in machine, stacking other piles on the pushed-in piles every time the piles are pushed in, then successively pushing them in by the press-in machine to support the underground structure of the building completed; a step of supporting the building completed by a column pushed into the underground and excavating the lower ground of the bottom concrete of the building in order to secure an underground space; and a step of placing concrete to the horizontal surface and vertical surface of the underground space secured by the step of excavating the lower ground of the concrete. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP2012127186(A) 申请公布日期 2012.07.05
申请号 JP20110276024 申请日期 2011.12.16
申请人 KOREA ENGINEERING & CONSULTANT CO LTD;BYUN HANG RYONG;KIM JUN-SON 发明人 BYUN HANG RYONG;KIM JUN-SON
分类号 E02D29/045;E21D13/00 主分类号 E02D29/045
代理机构 代理人
主权项
地址