发明名称 |
PRODUCTION PLANNING SYSTEM |
摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a production planning system, capable of optimizing the operation system and production schedule of a production system including a plurality of production lines according to demands. <P>SOLUTION: A CPU 18 changes the assignment priority of operation system of each production resource group 2 and/or production schedule of each product according to load of each production resource group 2 and/or delivery delay of each product by functioning as an initial production plan evaluation means 22 to re-create a production plan. According to this, the operation system and production schedule of the production line including a plurality of production lines can be optimized according to demands while suppressing excessive setting of shiftwork or overtime work. <P>COPYRIGHT: (C)2007,JPO&INPIT</p> |
申请公布号 |
JP2007034429(A) |
申请公布日期 |
2007.02.08 |
申请号 |
JP20050213339 |
申请日期 |
2005.07.22 |
申请人 |
MATSUSHITA ELECTRIC WORKS LTD |
发明人 |
OMURA TAKAYUKI;YUMOTO TAKESHI;TSUTSUI KENJI |
分类号 |
G05B19/418;G06Q50/00;G06Q50/04 |
主分类号 |
G05B19/418 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|