发明名称
摘要 A wind power installation having at least one cable passage means for passing through a hauling cable from a winch and a method of fitting/removing components of a wind power installation comprising laying a hauling cable from the winch to at least one deflection roller and further to the component to be fitted/removed, attaching the hauling cable to the component, and releasing and letting down or pulling up and fixing the component.
申请公布号 JP2005531709(A) 申请公布日期 2005.10.20
申请号 JP20040509270 申请日期 2003.05.23
申请人 发明人
分类号 F03D11/00;F03D1/00;F03D1/06 主分类号 F03D11/00
代理机构 代理人
主权项
地址
您可能感兴趣的专利