发明名称 BOILER MANAGEMENT METHOD
摘要 PROBLEM TO BE SOLVED: To provide a boiler management method for reducing working loads and hours in storage or restoring a boiler. SOLUTION: In storage of the boiler, low concentration chemical solution residing in a condenser 11, a condensing pipe and a deaerator 14 is circulated with chemicals being filled therein to generate high concentration chemical solution. The high concentration chemical solution in the deaerator 14 is supplied to the boiler 17 via a water supply pipe. Then, the concentration of the chemical solution in the boiler 17 is adjusted to high concentration. In restoring the boiler, the high concentration chemical solution is drained from the deaerator 14 and the boiler 17. The concentration of the high concentration chemical solution in the condenser 11 is adjusted to low concentration. The low concentration chemical solution in the condenser 11 is supplied to the deaerator 14 via the condensing pipe. The low concentration chemical solution in the deaerator 14 is supplied to the boiler 17 via the water supply pipe. The high concentration chemical solution pushed out of the condensing pipe and the water supply pipe is drained through drain valves provided in the deaerator 14 and the boiler 17. COPYRIGHT: (C)2004,JPO
申请公布号 JP2004169992(A) 申请公布日期 2004.06.17
申请号 JP20020336229 申请日期 2002.11.20
申请人 CHUBU ELECTRIC POWER CO INC 发明人 ITO KAZUTERU
分类号 F22B37/00;F22D11/00;(IPC1-7):F22D11/00 主分类号 F22B37/00
代理机构 代理人
主权项
地址