摘要 |
PROBLEM TO BE SOLVED: To provide a construction method for stabilizing a face of a slope with excellent work efficiency by using a drill pipe as a tension member. SOLUTION: In this construction method for stabilizing a face of a slope, drilled anchor holes 3 are vertically and laterally provided by a boring machine at specified intervals in the face of the slope 1 formed by cutting natural ground, the drill pipe 4 is left in the drilled anchor hole 3, cement milk 6 is filled in it to form a ground anchor 7, and an anchor fixing pedestal 8 having an insertion hole 9 at a center part is inserted and tensed to the drill pipe 4 protruded from the ground anchor 7 to be fixed.
|