发明名称 ENERGY MANAGEMENT SYSTEM, ENERGY MANAGEMENT METHOD, AND ENERGY MANAGEMENT DEVICE
摘要 To minimize the amount of calculation for changing an operation schedule even when there is an increase in the number of sites. A management computer calculates a first total schedule value, which is the total of the schedule values for each of the sites within a first time frame. If the first total schedule value exceeds a first target value set in advance, the management computer: calculates a first excess amount of the first total schedule value in relation to the first target value; selects, as a first site, a site subjected to a change in a demand schedule from a group of candidate sites satisfying a candidate criterion set in advance from among a plurality of the sites, the selection being performed on the basis of information on the facility characteristics for each of the sites; changes a first demand schedule of the first site in the first time frame; and transmits the changed first demand schedule to a device for controlling the first site.
申请公布号 WO2016189938(A1) 申请公布日期 2016.12.01
申请号 WO2016JP59052 申请日期 2016.03.22
申请人 HITACHI, LTD. 发明人 NAKANO, Michiki;IKEDA, Susumu;IKEMOTO, Yu;FUKUMOTO, Takashi
分类号 H02J3/14;G06Q50/06;H02J3/00;H02J13/00 主分类号 H02J3/14
代理机构 代理人
主权项
地址