发明名称 |
UNDERGROUND STRUCTURE, AND METHOD FOR RECONSTRUCTING BUILDING STRUCTURE HAVING UNDERGROUND SKELETON |
摘要 |
<p>PROBLEM TO BE SOLVED: To suppress the occurrence of bottom base floating and bottom base swelling of an existing underground skeleton and to reduce construction cost when a building structure having an underground skeleton is reconstructed.SOLUTION: An underground structure 10 during reconstruction of a building structure having an underground skeleton includes: an existing bottom base 22 and existing walls 24 remaining in an underground without being demolished; existing pillars 26 remaining in an underground without being demolished except a part of an upper side; newly constructed piles 32 installed downward from an existing bottom base 22; newly constructed inverted pillars 34 with bottom edges thereof buried in the newly constructed piles 32, respectively; and temporary angle braces 40 connecting the existing pillars 26 and the newly constructed inverted pillars 34 respectively to each other so that force can be transmitted therebetween.</p> |
申请公布号 |
JP2014211051(A) |
申请公布日期 |
2014.11.13 |
申请号 |
JP20130088248 |
申请日期 |
2013.04.19 |
申请人 |
OHBAYASHI CORP |
发明人 |
OKUDA KAZUHIRO |
分类号 |
E02D29/045;E02D31/12;E21D13/00 |
主分类号 |
E02D29/045 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|