发明名称 |
REINFORCEMENT METHOD OF PRECAST CONCRETE GIRDER IS CONNECTED WITH STEEL COLUMN |
摘要 |
PURPOSE: A reinforcement method of a prestressed concrete beam connected to a steel column is provided to reduce construction cost by reducing the additional reinforcing processes. CONSTITUTION: A reinforcement method of a prestressed concrete beam connected to a steel column is as follows. A structure [steel frame for preventing end tap is buried in a PC beam. A connecting steel frame(300) is combined with the steel column by burying in the end part of the PC beam. The angle is buried in the edge of the prestressed concrete beam and interlinks with the steel column to install the mold between angles.
|
申请公布号 |
KR20110009741(A) |
申请公布日期 |
2011.01.31 |
申请号 |
KR20090067075 |
申请日期 |
2009.07.23 |
申请人 |
CM PARTNERS |
发明人 |
SEO, JUNG HO |
分类号 |
E04C3/294;E04C3/08;E04C5/00 |
主分类号 |
E04C3/294 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|