摘要 |
PROBLEM TO BE SOLVED: To simplify station installation design of a base station, and to improve the frequency utilization efficiency. SOLUTION: In a radio communication method of a radio communication system, where a first base station CS4 and second base stations CS2, CS3 for traffic countermeasures are arranged within a single area, electric field intensity values are mutually measured in starting the radio communication system between the first and second base stations installed in the one area; and a main device ME connected to the first and second base stations analyzes the measured information to lower the area information and transmission power of the second base stations. The radio communication system is, for instance, a digital cordless system. COPYRIGHT: (C)2011,JPO&INPIT
|