摘要 |
Timber treatment fluid 7 is applied and maintained under pressure into a timber structural member 4 in a building through a hole in the building cladding 14 and into a hole drilled into the timber without removing the cladding from the building and timber member. The treatment of timber members in buildings by injecting and maintaining treatment fluid into the timber under pressure for the fluid to diffuse through the timber member from the injection site is not new.
|