摘要 |
<P>PROBLEM TO BE SOLVED: To provide a method for rapidly restoring damaged fill by combining a large-sized sandbag with a rod-like reinforcing material, which brings about sufficient strength for a permanent structure by short-time construction by virtue of the concurrent use of the large-sized sandbag and the rod-like reinforcing material, and which can shorten a time necessary for restoration by enhancing workability associated with the carrying-in and construction of a banking material and the compaction of the fill. Ž<P>SOLUTION: In this method for rapidly restoring the damaged fill by combining the large-sized sandbag with the rod-like reinforcing material, a shape of a collapsed surface of a damaged section 3 of the existing fill 2 is arranged. The large-sized sandbags 6 are installed in a piled manner on the collapsed surface the shape of which is arranged, and the rod-like reinforcing material 7 is driven in a skewering manner into the piled large-sized sandbags 6. Ž<P>COPYRIGHT: (C)2010,JPO&INPIT Ž
|