发明名称 |
METHOD OF CONTROLLING A RECOVERY AND UPGRADING OPERATION IN A RESERVOIR |
摘要 |
The present invention is directed to generating a range of petroleum products from bitumen or heavy oil reservoir by installing wells from a combination of surface and underground well-head platforms while controlling carbon dioxide emissions during thermal recovery operations.
|
申请公布号 |
CA2813001(A1) |
申请公布日期 |
2009.08.13 |
申请号 |
CA20092813001 |
申请日期 |
2009.02.06 |
申请人 |
OSUM OIL SANDS CORP. |
发明人 |
GIL, HENRY;SQUIRES, ANDREW |
分类号 |
E21B43/00;C10G1/02;E21B43/14;E21B43/24;E21B43/30;E21B43/34;E21B43/40 |
主分类号 |
E21B43/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|