摘要 |
PROBLEM TO BE SOLVED: To recognize communication failure between a game control means and a put-out control means and allow the put-out control means to surely receive a control signal when a power supply to a game machine is started. SOLUTION: When the power supply to the game machine is started, a reset signal is inputted in a reset terminal of a put-out control CPU (central processing unit). The put-out control CPU, when the reset signal is inputted, becomes operable. The reset signal is delayed in a delay circuit and then inputted in the reset terminal of a main CPU. Therefore, the time when the main CPU becomes operable is later than the time when the put-out control CPU becomes operable. The main CPU, when becoming operable, executes a security check processing and, after executing a software delay processing, starts an initialization and a game control processing. The put-out control CPU, when detecting the communication failure with the game control means, notifies it by LED (light emitting diode). COPYRIGHT: (C)2005,JPO&NCIPI
|