摘要 |
<p>PROBLEM TO BE SOLVED: To improve the operating efficiency of the carrying-in works of parts, and to shorten then term of works. SOLUTION: A plurality of fixed-fence units 8 as the parts for a platform fence are divided and loaded in a room for a car 4 for business, the car 4 for business is moved along a track, the car 4 is stopped on the side of a platform 5 so that the places of the fixed-fence units 8 loaded are brought near at the places of installation in the platform 5, and the platform 5 is brought down on the platform 5 from the car 4.</p> |