摘要 |
PROBLEM TO BE SOLVED: To provide a scheduling device for quickly correcting a preliminarily prepared schedule with high accuracy. SOLUTION: A processing work schedule for an object to be processed in a production line which has a plurality of processes and is also provided with a plurality of facilities capable of performing the same work in the respective processes, is stored in a database 2 and is subjected to image display as a Gantt chart on a display 3, the object to be processed and process name of a change source are specified by specifying the position of the image of the Gantt chart shown on the display 3, the changes such as facilities and processing start times are outputted to the database 2, and a rewriting instruction is performed further by designating the position of the change designation of the object to be processed. |