摘要 |
In a method for constructing a concrete floor of an upper storey of a structure, the structure having a lower storey enclosed by surrounding walls that are formed with window openings and that confine an internal space with an open top, a plurality of modular floor form units are first interconnected to form a floor form assembly. The floor form assembly is then hoisted into the lower storey of the structure through the open top and is secured to a ground surface of the lower storey before concrete is poured thereon. When the concrete floor is formed, the modular floor form units are removed one at a time and are moved to an exterior of the structure via one of the window openings for reassembly in preparation for another floor constructing operation.
|