摘要 |
PROBLEM TO BE SOLVED: To provide a work management system capable of inspecting energy resources required for manufacturing a product and of managing a work process.SOLUTION: The work management system includes: a management server for managing a work process; a work terminal which has a switch for switching a work drawing of a work process received from the management server and a control apparatus for transmitting the time when an operation of the switch is detected, in association with management identification information of the work process, as work result information to the management server; and a measuring instrument for measuring electric power supplied to a work object article disposed in a work place and transmitting the measurement data to the management server. The management server, for each piece of the management identification information of the work process, registers power consumption per unit hour and work hours with a registration unit on the basis of the received work result information and measurement data, and rearranges the work process so as to satisfy a limit value of power consumption during a prescribed period on the basis of the power consumption and work hours for each piece of the management identification information of the work process, when the limit value of power consumption during the prescribed period is accepted. |