摘要 |
A voltage generator includes a clock generator configured to generate a first clock signal and a second clock signal having a longer cycle than the first clock signal, a pumping unit configured to generate a pumping voltage in response to the first or second clock signal, a first detection circuit configured to detect the pumping voltage and generate a first control signal for controlling the operation of the pumping unit based on the result of the detection, and a second detection circuit configured to generate a second control signal for outputting the first or second clock signal generated from the clock generator depending on whether the first control signal maintains an enable state for a specific time. |