发明名称 |
Method and system for job scheduling |
摘要 |
Logical processors/hardware contexts are assigned to different jobs/threads in a multithreaded/multicore environment. There are provided a number of different sorting algorithms, from which one is periodically selected on the basis of whether the present algorithm is giving satisfactory results or not. The period is preferably a super-context interval. The different sorting algorithms preferably include a software/OS priority. A second sorting algorithm may include sorting according to hardware performance measurements. The judgement of satisfactory performance is preferably based on the difference between a desired number of time quantum attributed per super-context switch interval to each job/thread and a real number of time quantum attributed per super-context switch interval to each job/thread.
|
申请公布号 |
US8356304(B2) |
申请公布日期 |
2013.01.15 |
申请号 |
US20100827834 |
申请日期 |
2010.06.30 |
申请人 |
INTERNATIONAL BUSINESS MACHINES CORPORATION;EL-MOURSY ALI;EL-SHISHINY HISHAM |
发明人 |
EL-MOURSY ALI;EL-SHISHINY HISHAM |
分类号 |
G06F9/46;G06F11/00 |
主分类号 |
G06F9/46 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|