发明名称 |
METHOD TO RECOVER TIGHTNESS OF PRODUCTION COLUMN |
摘要 |
FIELD: oil-and-gas production. ^ SUBSTANCE: proposed method consists in arranging 5-10 m-high sand bridging plug in well below production strip defect and above perforation. Then, solution of Portland cement "" 1-50, Microdur RU with water-to-cement ratio of 0.8-0.9 in amount of 0.5-2.0 m3 per 1 m of the bed effective thickness at the following ratio of components: Portland cement "" 1-50 - 26.1-27.5, Microdur RU - 26.0-27.4, sulphacell - 1.0-1.1, water - 44.0-46.9. ^ EFFECT: higher reliability of insulation in eliminating production string uptightness. ^ 1 tbl |
申请公布号 |
RU2463436(C1) |
申请公布日期 |
2012.10.10 |
申请号 |
RU20110110626 |
申请日期 |
2011.03.21 |
申请人 |
GOSUDARSTVENNOE OBRAZOVATEL'NOE UCHREZHDENIE VYSSHEGO PROFESSIONAL'NOGO OBRAZOVANIJA "TJUMENSKIJ GOSUDARSTVENNYJ NEFTEGAZOVYJ UNIVERSITET" |
发明人 |
PANIKAROVSKIJ EVGENIJ VALENTINOVICH;PANIKAROVSKIJ VALENTIN VASIL'EVICH;SHUPLETSOV VLADIMIR ARKAD'EVICH;GORLOV IVAN VLADIMIROVICH;KUZ'MICH ANDREJ ALEKSANDROVICH;PANIKAROVSKIJ VASILIJ VALENTINOVICH;BAKLANOV VLADIMIR PETROVICH |
分类号 |
C09K8/504;E21B33/13 |
主分类号 |
C09K8/504 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|