摘要 |
<p>The method involves determining conditions of network elements of a railway system for rail-bound vehicles (20), and transmitting the determined conditions to a routing center i.e. radio block center (RBC). An acknowledgement is received from the center, where the acknowledgement verifies the reception of the conditions. The determined conditions of the network elements are changed by a signal tower (10), only if the acknowledgement is received, where the elements have routing signals (40) and/or switches (50). An independent claim is also included for a procedure for operating a routing center for a railway system for rail-bound vehicles.</p> |