发明名称 WELL BORE ZONE TREATMENT METHOD
摘要 FIELD: mining industry, particularly for production well development and reworking in the case of well production rate decrease as a result of well bore zone mudding with asphalt-tar-paraffin deposits and mechanical impurities. ^ SUBSTANCE: method involves treating well bore zone by providing depression pressure difference between well bore zone and well interior. To provide above pressure difference periodical pressure pulses are created as moving shock wave in well bore zone. The chock wave is formed by periodical well interior opening at well head for pressurized well fluid discharge and well interior closing when well fluid reaches sufficient movement speed. Necessary pressure is maintained in well interior by establishing periodical communication between well head and pressurized liquid source. ^ EFFECT: provision of sufficient internal well pressure during shock-wave well treatment. ^ 1 dwg
申请公布号 RU2266404(C1) 申请公布日期 2005.12.20
申请号 RU20040115381 申请日期 2004.05.12
申请人 发明人 SHIPULIN A.V.
分类号 E21B43/25 主分类号 E21B43/25
代理机构 代理人
主权项
地址