发明名称 COMBINED POWER GENERATION PLANT
摘要 PROBLEM TO BE SOLVED: To provide a combined power generation plant for shortening a time for a rated amount of steam to flow into a steam pipe by warming the whole steam pipe for supplying the steam from a boiler to a gas turbine at a time when starting the plant while preventing the flow of drain into the gas turbine. SOLUTION: The combined power generation plant has the steam pipe 10 with steam valves 11, 12 for guiding part of steam generated in the boiler 5 to the gas turbine 3. A gas turbine side drain discharge pipe 16 is provided in the steam pipe 10 located on the downstream side of the steam valves 11, 12 and a boiler side drain discharge pipe 13 is provided in the steam pipe 10 located on the upstream side of the steam valves 11, 12. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2005240667(A) 申请公布日期 2005.09.08
申请号 JP20040051207 申请日期 2004.02.26
申请人 MITSUBISHI HEAVY IND LTD 发明人 NAGAO HIDEKI
分类号 F01K23/10;(IPC1-7):F01K23/10 主分类号 F01K23/10