摘要 |
PROBLEM TO BE SOLVED: To provide an armor receiving deck for a man conveyor that is fastened and fixed to a rigid body through a stud bolt, in which deformation in fastening and fixing can be restricted. SOLUTION: Above a parapet column 4 fixed between a parapet panel 2 of a man conveyor and a building wall 3, an armor receiving deck main body 7 is provided to be continuously disposed in a man conveyor advancing direction. The stud bolt 8 is perpendicularly fixed to a lower surface to penetrate a through hole 10 provided in the parapet column 4. Between the armor receiving deck main body 7 and the parapet column 4, a plate-shaped denting preventing member 9 is provided. The denting preventing member 9 has a through hole 9a for the stud bolt 8 to penetrate, and it has a diameter smaller than that of the through hole 10 in the parapet column 4. COPYRIGHT: (C)2005,JPO&NCIPI
|