摘要 |
So as to eliminate wind dependent displacements in control cables such as are used in container loading facilities, the weight of the cable itself is increased. To this end, braided-over lead cords are arranged in the central elements of each conductor bundle and in the corner spaces of the core. The load-carrying capacity of the carrier member is ensured by high tensile strength plastic filaments in the form of a braid and optionally in the form of corner fillings. |