发明名称 |
CONSTRUCTION METHOD OF CELLAR FOR BUILDING COMPLETED |
摘要 |
Disclosed is a construction method of a cellar for a building completed. The construction method includes fixing supporting structures to bottom concrete of the building; installing a press-in machine on the supporting structures; inserting posts for supporting the building into the foundation under the building by inserting hollow piles into the holes to then insert the piles into the underground using the press-in machine, stacking new piles on the inserted piles, and sequentially inserting the piles using the press-in machine; excavating a foundation under the bottom concrete of the building to prepare an underground space when the building is supported by the posts; and placing the concrete on the horizontal and vertical faces of the underground space prepared by the excavating the bottom concrete of the building. |
申请公布号 |
US2012155968(A1) |
申请公布日期 |
2012.06.21 |
申请号 |
US201113327553 |
申请日期 |
2011.12.15 |
申请人 |
BYUN HANG RYONG;KIM JUN SEOUNG;KOREA ENGINEERING & CONSULTANT CO., LTD. |
发明人 |
BYUN HANG RYONG;KIM JUN SEOUNG |
分类号 |
E02D5/22;E02D13/00;E02D27/12;E02D27/16 |
主分类号 |
E02D5/22 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|