摘要 |
A simulation for an efficient allocation of the resources, such as funds and manpower, can be performed in plural concurrent projects in order to minimize a delay period and excess of cost. The simulation is practiced with each project regarded as an agent and the optimized solution is outputted by using a genetic algorithm. Specifically, a risk factor of each project is inputted by input means, and the optimal allocation of facilities and labor is determined by arithmetic means with a delay period and a delay event probability using a delay risk model, time development of production, and minimization of an objective function.
|