发明名称 FILLING CONSTRUCTION METHOD FOR EXISTING BURIED HOLLOW PIPE AND BACK FILLING CONSTRUCTION METHOD FOR EXISTING CONSTRUCTION
摘要 <p><P>PROBLEM TO BE SOLVED: To provide filler for an existing buried hollow pipe or filler for a cavity between a structure and the ground or a treatment method for an existing buried irrigation channel pipe. <P>SOLUTION: Filler for the existing buried hollow pipe is produced by recovering and storing minute powder soil 3 caused when washing gravel 2 sampled from a gravel pit and adhered to gravel, adding water 4 to it, and dissolving it to produce grout 1. Minute powder soil 3 adhered to gravel by washing gravel 2 sampled from the gravel pit is recovered and stored, cement or cement solidifying agent and other coagulant 5 are mixed with it, water 4 is added to it, and it is dissolved to produce grout 1. <P>COPYRIGHT: (C)2006,JPO&NCIPI</p>
申请公布号 JP2006125053(A) 申请公布日期 2006.05.18
申请号 JP20040314884 申请日期 2004.10.28
申请人 TAKATOKU:KK;ISHIZEKIGUMI:KK;ASAMI SANGYO KK 发明人 HONDA KAZUO;SHINOHARA MUNEMASA;FUJII TSUGIO;ASAMI TSUTOMU
分类号 E02D3/12;E21D11/00;C04B26/28;E02D3/00;E21F15/00;F16L1/024 主分类号 E02D3/12
代理机构 代理人
主权项
地址