发明名称 RHEOLOGY CONTROLLED HETEROGENEOUS PARTICLE PLACEMENT IN HYDRAULIC FRACTURING
摘要 A method of treating a subterranean formation penetrated by a wellbore includes preparing a treatment fluid with shear thinning, non-monotonic rheological properties, injecting the treatment fluid into the subterranean formation, and inducing shear rate softening phase transition in the treatment fluid. The non-monotonic rheology properties can be such that in the relationship between shear stress (s ) versus strain rate ( / ), where fx < j2 < /3 < /4, the shear stress values are s? < s2, (T3 < <T4, and <T3 < <T2. The method can heterogeneous Iy deposit proppant or solid acid in a fracture. A system to fracture a subterranean formation includes the fracturing fluid, a wellbore to inject the fracturing fluid to propagate a fracture in the formation, and a rate controller to inject the fracturing fluid into the subterranean formation at a minimum volumetric rate to provide a shear stress at an inlet to the fracture that exceeds CT2 - The method and system can achieve heterogeneous particle placement with either proppant or solid acid.
申请公布号 WO2008004172(A2) 申请公布日期 2008.01.10
申请号 WO2007IB52562 申请日期 2007.07.02
申请人 SCHLUMBERGER CANADA LIMITED;SERVICES PETROLIERS SCHLUMBERGER;SCHLUMBERGER HOLDINGS LIMITED;SCHLUMBERGER TECHNOLOGY B.V.;PRA RESEARCH AND DEVELOPMENT N.V.;HUANG, HAIYING;AYOUB, JOSEPH A.;SULLIVAN, PHILIP F. 发明人 HUANG, HAIYING;AYOUB, JOSEPH A.;SULLIVAN, PHILIP F.
分类号 主分类号
代理机构 代理人
主权项
地址