PURPOSE: A river inductive framework construction method is provided to prevent the erosion of a riverside and induce the deposition of a riverside and to induce a riverside line to be suitable for a waterside ecosystem by controlling the erosion and deposition of the riverside. CONSTITUTION: A river inductive framework construction method comprises the following steps: excavating a spot to be installed with a conductive frame (100); positioning a relatively large first heavy object (101) on the excavated spot; and positioning a relatively small second heavy object (102) on the top of the first heavy object.
申请公布号
KR20130114519(A)
申请公布日期
2013.10.17
申请号
KR20120036952
申请日期
2012.04.09
申请人
HALLA ENGINEERING & CONSTRUCTION CORP.
发明人
KIM, HYUN HO;HWANG, GIL SON;KIM, DONG OUG;KIM, BYOUNG MOON;LEE, KEON SEUNG