发明名称 SMART FOUNDATION SYSTEM
摘要 PROBLEM TO BE SOLVED: To provide a foundation construction system which eliminates the need of two or more times of concrete installation, frame mold constructions and demolition work in the foundation construction of one site, shortens a construction period, does not generate carry-in/carry-out work and storage of a frame mold, prevents a construction cost from becoming high, and does not make a countermeasure for moisture in an underfloor space be a problem.SOLUTION: The smart foundation construction system is a system for performing foundation construction by a deck plate 1, a reinforcing bar 5, hardware of an anchor bolt 5 and concrete 4. The foundation construction is completed by executing frame mold construction utilizing the deck plate 1, welding the reinforcing bar 5 and the anchor bolt 3 to the deck plate 1 and installing the concrete 4, and the deck plate 1 is also turned to a finishing material without being demolished.
申请公布号 JP2013189841(A) 申请公布日期 2013.09.26
申请号 JP20120085021 申请日期 2012.03.14
申请人 WORLD ROOM BLISS:KK 发明人 INOUE TAKAHARU
分类号 E02D27/01 主分类号 E02D27/01
代理机构 代理人
主权项
地址