摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a yard work plan for making versatility and performance scalability compatible, with emphasis upon practicality. <P>SOLUTION: In a method of the present invention, basic information required for the work plan of each organization, a plurality of job templates for connecting nodes showing starting or finishing of work processes by an arc according to an executing order, and a data base for storing resource definition data for defining the set of resource candidates usable in the work processes are prepared. Selection of the candidates of the job template for each organization, allocation of the resources to each work process, and determination of upper limit time and lower limit time of each node are performed so that the total penalty value is reduced. The total penalty value is calculated from the penalty values totaling the amount exceeding the permissible value out of the use for the predetermined time interval for reach resource allocated to each organization. Whether or not each selected job template is integrated with the yard work network showing the yard work plan is successively inspected, and if integration is possible, each job template is integrated with the yard work network. <P>COPYRIGHT: (C)2008,JPO&INPIT</p> |