PROBLEM TO BE SOLVED: To increase working efficiency by performing the other workings using a hoist in parallel with the placement of concrete without occupying the hoist when concrete is fallen and placed. SOLUTION: As a guide pipe 1 for placing concrete, a longitudinally extensible structure formed by fitting a plurality of unit pipes 10a to 10d to each other so as to be slid in the axial direction is used, and a manual winch 15 for controlling the height of a lower end opening is fitted to the guide pipe 1. The guide pipe 1 is inserted into a steel pipe column 20, the upper end side of the guide pipe 1 is fixed to the steel pipe column 20, and concrete filling operation is performed. According to the height of filling of the concrete in the steel pipe column, the height of the lower end opening is controlled by the winch 15. COPYRIGHT: (C)2005,JPO&NCIPI
|