摘要 |
PURPOSE:To enable the working efficiency to be augmented by arranging in a container set-up platform not only a zone which is opposite to a compactor but also numbers of zones at both sides of the above mentioned zone allowing all of them to be equipped with independent transfer devices, in a transfer device for refuse containers. CONSTITUTION:Empty containers 2 which are carried in by a container trailer 4, are transferred onto transfer devices 8 for three zones B, C, and D. Subsequently, the transfer devices 8 and 8' for the zones A and B are driven to the direction as shown by an arrow head allowing the container 2 in the zone B to be transferred to the zone A for positioning where refuses are pushed into the container 2 from a compactor 1. Then, the container is transferred onto a trailer (not shown) making the zone A empty. Subsequently, the container 2 in the zone C, and the container 2 in the zone D in succession are processed in order in the similar manner. This configuration enables the working efficiency to be augmented with no attention paid to a place where the container is supposed to be unloaded. |