发明名称 BLOCK PAVEMENT AND EXECUTION METHOD THEREFOR
摘要 PROBLEM TO BE SOLVED: To settle a problem of being unable to perform water permeable pavement by block pavement because water cannot be drained in a mutual horizontal directional communication cannot be obtained as respective blocks are separated and independent in the horizontal direction by an injection joint material, though water permeates in the vertical direction when using water permeable blocks as the blocks in the block pavement laid with pavement blocks on an aggregate layer laid on a base layer of a road. SOLUTION: The pavement blocks are laid all over in a mutually close contact state on the aggregate layer laid on the base layer of the road, and the pavement blocks are integrally stuck by injecting and filling cement asphalt mortar into the aggregate layer from an injection hole by a state of deviating the closely laid pavement blocks at prescribed intervals. The mutual pavement blocks are formed as a mutually close contact structure, and the pavement blocks are formed of the water permeable blocks, and are formed as a structure for draining water by the mutually continuing water permeable blocks.
申请公布号 JP2001348802(A) 申请公布日期 2001.12.21
申请号 JP20000172657 申请日期 2000.06.08
申请人 TOA DORO KOGYO CO LTD 发明人 UCHIYAMA KAZUHIKO;HIROTSU EIZABURO
分类号 E01C5/00;E01C13/04;(IPC1-7):E01C5/00 主分类号 E01C5/00
代理机构 代理人
主权项
地址