摘要 |
PROBLEM TO BE SOLVED: To provide a reclamation method which can use sediment containing large diameter gravel and enables construction of the reclaimed ground with stable density and strength, and a mixed material for reclamation.SOLUTION: A mixed material for reclamation, which is prepared by mixing a stabilizer, a separation inhibitor and water with sediment containing large diameter gravel, is added into water. The mixed material for reclamation added into the water is compacted every certain layer thickness. A reclamation method includes the step of: preparing the mixed material for reclamation by mixing and stirring paste comprising the stabilizer, water and the separation inhibitor, with the sediment; adding the mixed material for reclamation into water; and compacting the mixed material for reclamation added into the water every predetermined layer thickness. |