摘要 |
PURPOSE: A construction method of soil panels is provided to obtain integrity by blocking masonry joint in soil paved road. CONSTITUTION: A construction method of soil panels comprises the following steps: continuously installing soil panels(201, 202) on each horn-peak; filling filler(210) in the gap generated at the contact point area of the soil panels; and curing the filler and coating soil water(220) on the soil panel in spray method. The filler includes granite soil powder and red brick powder. The soil water comprises granite soil powder having the thickness of 1mm, red brick powder, nonshrinkage mortar, acryl class polymer, and water-soluble epoxy. [Reference numerals] (AA) Gap
|