发明名称 |
METHOD FOR INDUCING FRACTURE COMPLEXITY IN HYDRAULICALLY FRACTURED HORIZONTAL WELL COMPLETIONS |
摘要 |
A method of inducing fracture complexity within a fracturing interval of a subterranean formation comprising characterizing the subterranean formation, defining a stress anisotropy-altering dimension, providing a wellbore servicing apparatus configured to alter the stress anisotropy of the fracturing interval of the subterranean formation, altering the stress anisotropy within the fracturing interval, and introducing a fracture in the fracturing interval in which the stress anisotropy has been altered. A method of servicing a subterranean formation comprising introducing a fracture into a first fracturing interval, and introducing a fracture into a third fracturing interval, wherein the first fracturing interval and the third fracturing interval are substantially adjacent to a second fracturing interval in which the stress anisotropy is to be altered. |
申请公布号 |
EP2456952(A2) |
申请公布日期 |
2012.05.30 |
申请号 |
EP20100739662 |
申请日期 |
2010.07.23 |
申请人 |
HALLIBURTON ENERGY SERVICES, INC. |
发明人 |
EAST, LOYD, EDDIE, JR;SOLIMAN, MOHAMED, Y.;AUGUSTINE, JODY, R. |
分类号 |
E21B43/30;E21B43/26 |
主分类号 |
E21B43/30 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|