摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide an underground lead-in wire work management system for an underground electric line allowing efficient and accurate execution of the optimum design for laying work of the underground lead-in wire, when laying the underground lead-in wire for the underground electric line. <P>SOLUTION: This underground lead-in wire work management system for the underground electric line is provided with a database 200 including at least an existing facility database 210 including all the existing facilities in the underground electric line, a laying information database 220 including all the information pieces and acts to be investigated for laying the underground electric line, and a work reference database 230 including all the work references and acts of the various facilities, and a work designing database 240 accumulated with work design for other facilities in the underground electric line, and is further provided with a laying design 130 specifying at least a laying route of the underground lead-in wire, a laying system thereof, and sizes and number of laid cables, and an underground lead-in wire work designing means 110 for returning the underground lead-in work design 140 back to a reinvestigating stage for reinvestigating the work design for the other facilities, when the work design 140 is difficult to be executed. <P>COPYRIGHT: (C)2006,JPO&NCIPI</p> |